Activate EDI 214/315 interface with SAP EM via SAP PI using EVMSTA02 IDOC

Jul 06, 2017 at 05:28 PM

117

avatar image
Former Member

Hi All,

Can you please help me what are the configurations and setup is required in order to activate event notification interface for posting EDI 214/315 events in EM via SAP PI using EVMSTA02 IDOC.

As per current system landscape the carrier will report 214/315 events to MG system (third party system) where MG will call SAP PI system to map with EVMSTA02 IDOC for posting the 214/315 events in SAP EM system.

In order to achieve the above solution, what are the configurations and setup is required in SAP EM and SAP PI systems to post the 214/315 events in EM. for example, WE20 partner profile setup, IDOC configurations for posting events, etc . Please let me know all the configuration and setup details.

If you have any SAP standard documentation to follow the configurations/setup to achieve the above solution that would be really helpful.

Thanks

Sudhan

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

avatar image
Former Member Jul 08, 2017 at 02:40 PM
0

Hi,

Can someone please respond on this which is very helpful for all to follow the standards when activating the 214/315 interface with SAP EM using PI and EVMSTA02 Idoc.

Regards

Sudhan

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Sep 04, 2017 at 04:40 PM
0

This is not as simple as providing the steps or writing in a blog...

I have done this exercise for several customers and each was a lengthy project... I have a template but it's specific to the 214 / 315 used and the particular EM implementation that the EVMSTA02 Idoc refers 2. Every implementation is different so a template won't help too much unless you understand how it all ties together. You will need to get the following knowledge together in order to make this happen:

  1. EDI 214 / 315 EDI specifications for each carrier / freight forwarder
  2. Sample 214 / 315 for each scenario
  3. IDoc EVMSTA02 IDoc structure
  4. SAP EM configuration used for the EH of the tracking numbers (EH Type, Tracking IDs, Events, Parameters, ...)
  5. Mapping doc from 214 / 315 to EVMSTA02 that will fill the needs of (4)
  6. Perform all the technical integration settings to tie the EDI system with SAP NW PI with SAP EM

Lots of consideration goes in to each of the above steps. In addition, doing that in a project involves ensuring that you do good end-to-end QA testing for each of the applicable test scenarios (Can be many!)

Hope that helps.

Regards

Kevin