Skip to Content
author's profile photo Former Member
Former Member

Badi

anyone knows what does the follow method : "set_program_for_okcode_routn" do?

it belongs badi_material_od.

thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 30, 2007 at 01:26 PM

    hi

    good

    For each additional screen, you should create an OKCODE routing, regardless of whether the screen is called as an additional screen in the sequence or by pushbutton. The OKCODE routine must be implemented in the same function group. To call the OKCODE routine, use BAdI method SET_PROGRAM_FOR_OKCODE_ROUTN to make the name of its own program known to flow control for the material master.

    http://help.sap.com/saphelp_erp2005vp/helpdata/en/b9/327b3ccdc09b28e10000000a114084/content.htm

    thanks

    mrutyun^

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.