on 05-30-2007 11:25 AM
Hi PP Gurus,
Can any one will tell me the Batch Activation & Step wise procedure for it.
I am dealing with process industry
Madan
Hi Madan
Pl check this link
http://www.sap-img.com/materials/config-setting-in-batch-management.htm
If useful reward points
Regards
Ranga
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You have to activate Batch management in Plants,
Activate the Batch Management level, Client level, Material Level, Plant Level.
Specify Batch Number Range
and follow the following steps in SPRO
Specify Batch Level and Activate Status Management
Batch Master
Batch Number Assignment
Creation of New Batches
Batch Valuation
Batch Status Management
Batch Determination and Batch Check
Batch Where-Used List
Shelf Life Expiration Date (SLED)
Create a Class (Batch 022/023) and Characterisitic for all the which you want to measure, in your case colour, maintain colour as characteristics.
For all batches enter the characteristic Colour value as defined and maintained for different vendors.
You have to activate Batch management in Plants,
Activate the Batch Management level, Client level, Material Level, Plant Level.
Specify Batch Number Range
and follow the following steps in SPRO
It is used to have the characterisitics of the batch like Solubility, thickness, any other such.
It is used to back track easily, which material which batch has consumed in a specific batch.
It is easy to recall a specific batch when a problem is noticed in a batch.
It is used to segregate materials basing on Shelf life expiry date.
These are some of the cases.
Hope this helps you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.