Run MRP for STO

Hi all,

Plant 8020 is receiving plant, and Plant 8030 is issuing plant;

For material A, the material master data maintained as follow:

In Plant 8020: MRP view, Accounting view, Costing view, and set special procurement key as 40 ( Issuing plant is 8030)

In Plant 8030: have no any plant level material master data

When I run MRP with MD03 for material A, system report the errors: "Material A not maintained in plant 8030". I confuse why need maintain material master data in 8030 for material A.

I tested above scenario in IDES, system can create PR and have no any errors. But in our DEV, system will report above errors and can not create the PR, our DEV system version is ECC EHP8. Is this the bug FOR EHP8?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Oct 11, 2017 at 03:46 AM

    Hi Peixi,
    I believe the error is issued correctly. Plant 8030 is the issuing plant for material A, which means there must be some stock for material A in issuing plant 8030. If material A is not created in plant 8030, how the plant issue the material?

    best regards,
    Jessica