cancel
Showing results for 
Search instead for 
Did you mean: 

Asset depreciation is posted in AFAB but the status is "planned" in AS03

0 Kudos

Hi SAP Consultants,

Have encountered issue in t-code AS03. The asset status for period where depreciation is posted was "planned" even the depreciation is posted successfully in t-code AFAB.

May I ask assistance about this issue?

Thank you.

Jeremiah Dollente

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Have checked SM37 and found out that this one asset number was used by another SAP User ID while executing the background job.

Answers (1)

Answers (1)

former_member234122
Discoverer
0 Kudos

you have posted only 5 period . Infact the value 6083,20 is the sum of 5 mouth