Hi Experts,

I have Query in which i have to transfer the MRP controller field data of Material Master of a particular Material from ECC to SNP planner Field of the same Product in APO.

This MRP controller Field in ECC is not of table MARC which is present in the tab MRP1 but it is of Table MDMA-DISPO which is present inside MRP1-> MRP Area Button-> Select any MRP Area -> MRP controller.

Path for thei MRP controller is MM02-> MRP1-> MRP Area Button -> Select any of the MRP Area-> The MRP controller Field inside this MRP area is need to be moved from ECC top APO withouf CIF.

The Problem i am facing is the USER EXIT CIFMAT01 does not get triggerred if we change this field in material master as it is not present at the plant level.

Can Anyone suggest how can i achieve it?