Good issues

Dear All,

I have a problem regarding calculation of WIP. Myclient are using Paint in one shop They are purchasing 5Lt of paint and reservation is for only 3.5 Lt. (comming from BOM). But store issues 5 Lts . After using the material in production the remaing 1.5 lt ie, WIP is with the shop only. The next day again the requirment for 3.5LT. and tht store has to issue 5LTs. Pack only

Now my client want to calculate this WIP, and he want to issue the remaing quantity only. how system will calcualte WIP. My PP consultant told me that during production posting is not at all possible from the plant side. Pls . Help.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 28, 2007 at 08:30 AM

    For this kind of scenario you should not issue the material instead you will have to transfer the material to the respective storage loaction. The required quantity used should be consumed thouugh backflushed in production.

    Or 5 litres should be transferred to the respective storage location and 3.5 litres should be issued.

    Regards

    Soundararajan M.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.