Skip to Content
avatar image
Former Member

Costcenter change not integrated in distributed OM scenario

Hello all!

I have setup a distributed OM and HR scenario between two systems:

  • System A maintains the OM structure(O + S) and cost center(K) and job(C) assignments
  • System B maintains employee data and assigns employees to positions

With the ALE distribution model and some conversion of field values using BADI's in place, the integration is now working except for one thing: Whenever we change a cost center assignment in system A, the affected employees in system B are not updated while the orgunit/position the cost center is assigned to, was updated correctly. This seems to be an integration issue between OM and PA, as when we delete the cost center assignment in system B and reassign the cost center, the employees are updated as I would expect.

I hope someone can help us solve this issue, distributed OM is working perfectly otherwise.

EDIT 5-7-2017

We have the same problem when the jobcode assigned to the position is changed

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Jul 05, 2017 at 09:49 AM

    We have found the solution: The switch ALE INTE has to be activated on the receiving system, then integration works perfectly

    Add comment
    10|10000 characters needed characters exceeded