Skip to Content
0

Incorrect required min shelf line in product master- Embedded EWM

Jul 03, 2017 at 07:01 AM

52

avatar image
Former Member

Hi All

I am setting up Embedded EWM on S/4HANA. Testing GR process with /SCWM/GR transaction. Product is batch managed.

Issue is that ECC material master plant/sloc1 view has SLED period indicator as 'M-Month'. Minimum shelf life as '1' & max as '24'.

But product master in /SAPAPO/MAT1 has both minimum & maximum period as '24'. System does not allow this to be corrected in /SAPAPO/MAT1 Or /SCWM/MAT1. Behavior is same when material has indicator 'D-days'.

This is incorrect. Could not find any configuration or note to correct this. Please do let me know if you have faced this issue. Waiting for your response. I am rising this to SAP in parallel. Thank you.

Regards

Phani

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers