Engineer to order

Former Member
0 Kudos

Hi

Can any body explain the Engineer to order scenario in detailed manner.

Thanx in advance

Regards

Basava Srinivas

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hello,

Manufacturing environment in which complex production activities under essentially one-off conditions are undertaken for a specific customer. The production structures are managed using a work breakdown structure (WBS). At this level, the following planning steps for the project are carried out: Budget Management, Revenue Planning, Finance Planning, and Cost Planning.

The production processes are managed using a network. The dates, resources, and associated costs are planned at this level.

Hope this helps!

Payam

P.S. Resource: SAP Library - Glossary

former_member196398
Active Contributor
0 Kudos

Basava,

Every product on an Engineer to order situation is likely to be unique, and generally the demand comes from WBS/Network/Activity of a Project.

Regards,

Prasobh

Former Member
0 Kudos

Hi,

Engineer to order scenario is quite similar to Make to order scenario, only diff. is that in MTO . prod.order is created with respect to sales order,

In engineer to order scenario production order is created with respect to WBS element, In WBS element there are network & actvities, One WBS cancontain more than one material.

After confirmation of production order this stock is stored as Special Stock for the Specific WBS element.

Regard's

Sachin

Former Member
0 Kudos

Hi BS Rao

as Mr Ranga explained, it is similar to Make to order scenario, but the only difference is that you mostly will create a separate set of master records like Material master, BOM and routings exclusively everytime for a new product as it starts right from engineering drawings to shop floor execution, unlike in MTO scenario where there might not no need to create new master data as the parts can be used again and also im MRP 4 you need to include Individual/ collective reqmnts indicator =1 to trigger requirements during MRP run exclusively for the new product

hope it helps

Former Member
0 Kudos

Hi

I think you mean Make to order.

This is used for the material which will have sales order over the period in the early stage itself .

The requirements will be created against the sales order in MRP.

You have to use strategy 20 in MRP3 view.

Also strategy 50,60 can be used.

please check this link also for further help

http://help.sap.com/saphelp_47x200/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm

If helpful reward your points

Regards

Ranga