all,
i have created a material master with UOM conversion
1 LGT = 6 M.
then i create WO with reservation 8.507 LGT. if i look at tab general data (IW32), base quantity is 51.050. if we calculate 8.507 * 6 = 51.042. is there any config for rounding value?
Thanks,