Skip to Content
0
Former Member
May 14, 2007 at 09:00 PM

Material determination

48 Views

Hi

If I have specified a material determination in trans.code VB11.

Is it possible somehow to use the material that was substituted without the substitution taking place? I need to make some orders in VA01 using the "old" material without removing the determination.

/ H