on 06-26-2017 2:55 PM
Dear Experts,
We have a material X for which a production order to be created. It has 5 operations and for the first 2 operations the production is carried out in the same plant for the whole lot. For the third operation part of the material is produced in the same plant A, other part produced in another plant B and the rest sent to sub-contracting vendor C, and all takes place at the same time. Then all the materials sent to the operation 4 in the same plant A after which the half of the material is sent for plant B and the remaining operations carried out in the same plant A. How to set up the routing for this process.
Thanks.
Hello
I would use parallel sequences to map this scenario. You would have 3 sequences branching on operation 30 and returning on operation 40.
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Almeida.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.