Selection of components in multi-level BOM

Jun 26, 2017 at 01:49 PM

30

avatar image

Dear Experts,

We have three level of Bill of Materials and three production orders are created for the header materials at three levels. Some time the selection of characteristics should select the BOM components and the respective operations at the second and third level as well in addition to the first level. Is it possible to define that without constraint ?

Thanks.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Best Answer
Keyur Mistry Jun 30, 2017 at 05:08 AM
0

Mr,

yes it is possible to determine without constrain.

Selection condition will do best JOB for you to pickup the component and it's operations.