Dear Experts,

We have three level of Bill of Materials and three production orders are created for the header materials at three levels. Some time the selection of characteristics should select the BOM components and the respective operations at the second and third level as well in addition to the first level. Is it possible to define that without constraint ?

Thanks.

Accepted Solutions (1)

Accepted Solutions (1)

keyur_mistry1
Active Participant
0 Kudos

Mr,

yes it is possible to determine without constrain.

Selection condition will do best JOB for you to pickup the component and it's operations.