Hi,
we confirm time ticket operation wise then if user confirm operation no 1 operation qty as 95 and scrap as 5. Then next operation system should purpose 95 as operation qty. At present it is showing as 100.
How can this be achieved.
Hi
Make sure you have maintained Assembly scrap 5% in the Material Master MRP1 view for the material which has got consumed in the 2nd operation
Regards
Sanga
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
In OPK4 - Order confirmation parameters,change the operation sequence settings as E - Error when operation sequence is not adhered for particular order type.
System will proposed actual confirmed qty of 1st operation for 2nd operation and it will now allow to confirm more qty than 1st operation.
Regards.
Swapnil Rajane
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.