Skip to Content

Connector issue while integrating HANA with GRC

capture.png

Hi All,

I am trying to integrate HANA with GRC. I have done all the configuration correctly in SPRO but when I trying to run the synch job in SPRO I am getting connector issue. But when I check the connection in dbco it is working fine. Please confirm if any one has faced the similar issue.

capture.png (59.1 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers