Skip to Content
author's profile photo Former Member
Former Member

PC transports failing

Friends,

We are using BI with Patch 10 and we just started to move our Process Chains (which were developed in BW 3.x version) to Test box and finding that all objects/processes of the PC are failing and mostly with the termination code (12). In BI we have changed the PC's an trying to move..

Is there any thing we are missing or any specific transport settig need to be done ??

Please let me know if you have any clues.

Regards

Mavip

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 25, 2007 at 08:01 PM

    Check the transport log.

    If you share the error messages, that will be helpful.

    Ravi Thothadri

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Bhanu Gupta

      That's what I replied to Ravi. There is Not much info in the Log, except the message I mentioned above with the error code "RSPC135".

      Did anybody had any issues moving the 3.x PC in BI upgraded environment.

      Thanks

      Mavip

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.