Skip to Content
author's profile photo Former Member
Former Member

Load confirmation

Hello Gurus,

Working on delta loads-

The delta load on 03/11/2007 fails due to loss of connection between R/3 and BW

I repeated the delta on 03/12/2007. How do I make sure that the 03/11 load and 03/12 load have been successfully posted to BW?

Is there a mechanism in R/3 which tells which load was dispatched on which date and how many records it contianed.

(I guess RSA3 will only give us number of records ready to be dispatched currently and not the prior dates)

Please help.

Regards,

KS

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 25, 2007 at 07:24 AM

    Hi,

    When you go to the monitor on the infopackage, you have an option of choosing the time period within which you want the logs to be displayed. All logs will be stored, & through the logs, you can find out the no of records that were loaded.

    You can also go to transaction RSMO & find all logs for Data Load Monitors.

    Hope it helps.

    Regards...

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.