Sol Man migration documents from 7.1 to new installation 7.2

Hi,

It's possible to migrate Sol Man documentation from 7.1 to a new Sol Man installation 7.2 ?

I have a lot documentions in Sol Man 7.1 and I am planing to instal a new fresh instalation of Sol Man 7.2 and later migrate the old documentation from Sol Man 7.1.

It's possible ? Content Activation can do that ?

Thanks.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    Jun 21, 2017 at 01:55 PM

    Hi Andre de Barros Faria

    if you want to use the existing documentation it is better that you go for content activation or basically upgrade for your existing system.

    you have execute prepare_activation before upgrade and then post upgrade content activation GP2 which is available in 7.2

    this will it migrate all the project to your new solution with structure documents etc.

    https://wiki.scn.sap.com/wiki/display/SM/SAP+Solution+Manager+7.2+Content+Activation

    hope this helps

    Thanks

    Prakhar

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 19, 2017 at 02:01 PM

    Hello,

    Content Activation only works for upgrades.

    There is one way to transfer the content for your case, but it is not recommended.

    --

    Q: Is it possible to transfer existing Solution Documentation content from SAP Solution Manager 7.1 into a fresh installation of SAP Solution Manager 7.2?

    A: This scenario is currently not fully supported by SAP and has some major limitations. Nevertheless, it is technically possible using SAP CAL. You can find more details in the SAP Solution Manager Media Center.

    Please note that the only officially recommended procedure is an upgrade of an existing SAP Solution Manager system, if you need to preserve your existing solution documentation.

    --

    See this link (point 1): https://wiki.scn.sap.com/wiki/display/SM/Frequently+Asked+Questions+%28FAQ%29+on+Content+Activation

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 20, 2017 at 10:58 AM

    Indeed it is not recommended. If you plan to transport projects you will miss data unless you export them with the report coming with note

    2391886.