Skip to Content
0
Former Member
Apr 23, 2007 at 11:21 AM

DTP

7 Views

We are facing some issues with DTP loads. In order to check whether it is DTP related I would like to load to the ODS from an InfoPackage directly rather than through the DTP.

In order to do this I will create a new package which will load to PSA and target in parallel (the source is 0Mat_Plant_Attr).

Is there any issues with future loads (which are carried out in a process chain) from the DTP if I do this? Thanks