Skip to Content
0
Former Member
Apr 23, 2007 at 08:37 AM

LTP

21 Views

Hi all

I have created a LTP scenario where I created demand thru T.code MD61 but gave a own created version. I have assigned this version to the planning scenario of LTP and activated it. But, I am able to see these requirements even in active MRP without my transferring them. Could someone tell me where the link is missing so as to disable the simulative requirements to be seen in active MRP without transferring them manually.

Points assured.

Chandra