cancel
Showing results for 
Search instead for 
Did you mean: 

FI-CA - Data issue with Cleared items using data source 0FC_CI_01.

Former Member
0 Kudos

Hello Experts,

We are extracting cleared items from Data source 0FC_CI_01 which will be loaded to BW info cube.

But currently we are using program RFKK_MA_SCHEDULER for filling cleared items for the current date in SAP ECC system which updates table DFKKCIBW.

Data which is updated via program RFKK_MA_SCHEDULER has less number of records for a particular date and causing date issue in BW side.

when i use t-code FPCIBW for filling cleared items then all records are coming in table DFKKCIBW.

Currently i am deleting previous month data during closing and re-loading it via t-code FPCIBW.

What is the difference between running via T-code FPCIBW and program RFKK_MA_SCHEDULER.

Kindly guide why we are missing records when we are using program RFKK_MA_SCHEDULER with mass activity CIBW.

Thanks in advance.

Regards

Shivaraj

Accepted Solutions (0)

Answers (1)

Answers (1)

william_eastman
Advisor
Advisor
0 Kudos

Using RFKK_MA_SCHEDULER does not affect the process. The only difference could be in the template you are using for the scheduling.

Former Member
0 Kudos

Hello William,

Clearing Info cube was deleted and Re-loaded in Dec 2016.

1. In SAP ECC side, Program RFKK_MA_SCHEDULER was triggered with below selections.

Mass activity type - CIBW.

Date ID - 12/12/2016.

Identification - CI0001.

2. On BW side, full infopackage was run with above Date ID and Identification number for the initial load.

Currently we have job which is triggered in SAP ECC using Program RFKK_MA_SCHEDULER on a daily basis and info package is triggered the current date selection and Identification as CI0001.

Job details -

Currently Job which is running in SAP ECC system as below values .

We are running BW info package load with selections 0FC_RUNDATE=20170620 (OLAP Variable which picks up current date) ;0FC_RUN_ID=CI0001; on daily basis.

Kindly check and let me know if i am missing something on scheduling part.

Thanks a lot.

Warm Regards

Shivaraj

Former Member
0 Kudos

Hello William,

Awaiting your response.Kindly add your pointers.

Thanks in Advance.

Warm Regards

Shivaraj

UmaArjunan
Active Participant
0 Kudos

hi Shivaraj ,

Is this issue resolved ?