04-19-2007 1:14 PM
The remaining shelf life of a particular batch will have to be calculated dynamically and then compared with the selection criteria..
t CODE VL02N
BATCH IS msc2n
Need to find out the exit for this.
warm regards
sarma
04-19-2007 1:35 PM
Hi Nanjunda,
These are the exits available for this t.code.
u can check the corresponding exit and provide the logic in include and activate the include. The corresponding program automatically call the exits if u want to see that provide the breakpoint.
V02V0001 Sales area determination for stock transport order
V02V0002 User exit for storage location determination
V02V0003 User exit for gate + matl staging area determination
V02V0004 User Exit for Staging Area Determination (Item)
V50PSTAT Delivery: Item Status Calculation
V50Q0001 Delivery Monitor: User Exits for Filling Display Fiel
V50R0001 Collective processing for delivery creation
V50R0002 Collective processing for delivery creation
V50R0004 Calculation of Stock for POs for Shipping Due Date Li
V50S0001 User Exits for Delivery Processing
V53C0001 Rough workload calculation in time per item
V53C0002 W&S: RWE enhancement - shipping material type/time sl
V53W0001 User exits for creating picking waves
VMDE0001 Shipping Interface: Error Handling - Inbound IDoc
VMDE0002 Shipping Interface: Message PICKSD (Picking, Outbound
VMDE0003 Shipping Interface: Message SDPICK (Picking, Inbound)
VMDE0004 Shipping Interface: Message SDPACK (Packing, Inbound)
Rewords points.
Rgds,
P.Naganjana Reddy