Skip to Content
avatar image
Former Member

Defining CMS Track Data for 4 systems landscape

Hi all,

We are configuring CMS for 4 system landscape (DEV - TEST - QA - PROD).

The Track Data only allow 3 system landascape , as we can see "Landscape Configurator " and also in the following documentation:

http://help.sap.com/saphelp_nw04/helpdata/en/e9/c7cb6545a3446b92eff4f9ba876072/frameset.htm

XI Repository URL DEV

HTTP address of the server on which the XI development system is installed

XI Repository URL CONS

HTTP address of the server on which the XI consolidation system is installed

XI Repository URL PROD

HTTP address of the server on which the XI production system is installed

The question is :

" How can we define Track Data for 2 Consolidation Landscapes " ?

Thanks

Artur Moreira

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    May 10, 2007 at 11:23 AM

    Hi,

    Thanks for the Help.

    I have defined 2 Tracks Data.

    But I only can get the first one . I didn't see the second.

    So, I cannot link one to the other.

    Anyone know how to get the diferent track data lists ?

    And how to link them ?

    Thanks

    Artur Moreira

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Artur,

      If I understood your issue, you have defined one track data, but you can't define the second and this second is the one on you have the new system, am I right?

      Maybe the new system is not able to be seen in you landscape. When you try to save a track data, the system performs a check (a ping to host that you want connect) if it can't reach this host, the track data is not saved and you can't create it.

      Check with your admin team 😉

      Cheers,

      Ricardo.

  • avatar image
    Former Member
    Apr 18, 2007 at 03:37 PM
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 19, 2007 at 10:04 AM

    Hi Artur,

    You need to define two “tracks” on CMS.

    Track 1: DEV -> TEST

    Track 2: QAS -> PRD

    … and link these two tracks with a track connection.

    After that you must redefine your target groups (SLD) and change the configuration in your Integration Directory (Business Systems and Com. Channels).

    I hope it works 😉

    Cheers,

    Ricardo.