Bill Of Materials

Jun 10, 2017 at 04:00 PM

74

avatar image
Former Member

Hello All

We are using SAP B1 9.1.

We manufacture item A, B and C at site 1.

This items were moved to site 2.

The items A B and C are a part of BOM of Item X which is manufactured at site 2.

Now we have changed the process

We assemble item A B and C via a production order and call that item D.

We move item D to site 2.

Now I cannot book the Item D into the warehouse because we do not have item A B and C on the shop floor. However I do have item D ( Which consists of A B and C) on shop floor.

Is there a way this can be solved, otherwise we will have to change too many BOM's.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Danilo Kasparian Jun 12, 2017 at 07:38 PM
0

What do you mean by book the Item D? Are you booking the Item D in the same site that it was moved?

Did you receipt your production? What is your BOM Type?

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Aug 30, 2017 at 08:05 AM
0

Hi Friends

Please guide me we are going to configure BOM in our workshop.
Please guide me what are the basic things to be considered in discussion point about BOM.

Regards & thanks in advance

Partha

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hi Partha, in BOM you can put F1 for more information.

Regards.