Configuring Maintenance Optimizer issue

33 Views

Hi All,

This is the first time I am configuring SM 4.0. I am done with installation, and want to conigure maintenance optimizer.

I followed the IMG guide step by step.

But after all done, there are no systems listed under the maintenance optimizer of my Solution Landscape.

Instead I get a message:

<b>Change requests cannot be displayed or created, because the RFC connection has errors, or is not maintained.

Check whether the RFC connection to the Change Man agement system is under the key CHARM_DEST (APPLI field in the DESTINAT field), in the view BCOS_CUST. You need authorization for the cross-client view/table maintenance (S_TABU_DIS and S_TABU_CLI).

Check the RFC connection in the transaction SM59. If your SAP Solution Manager system is also your Change Manager system, the internal connection must be 'NONE'. You need authorization for the administration of RFC connections (S_RFC_ADM).</b>

Meanwhile I have issue with my J2EE engine not starting due to some UME issues, which I am working on parallely.

Please do let me know what would be the issue.

I have followed the note 990534 and doen with the BC sets.

But I am not sure where am I making a mistake.

One more doubt is, does maintenance optimizer connect to the SAP service market place through SAPOSS??? and am I not seeing anu system because my SLD is down. Please bear with my ignorance, I am a little lost here.

I have completed the solution landscape, logical component, etc.

Please help...

Regards,