documents required in ASAP

Hi all,

Can any please me in breef, what are all the documents that prepared wile in total implementation process.

1. project preparation

2. blueprint

3. realization

4. finalization

5. golive and support

In above all phases what are all the documents we are suppose to prepare.

Thank you

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 03, 2007 at 04:08 AM

    Hi,

    Introduction to ASAP Methodology

    Accelerated SAP methodology is proven, repeatable and successful approach to implement SAP solutions across industries and customer environments.

    It provides content, tools and expertise from thousands of successful implementations.

    Phase 1: Project Preparation :

    During this phase the team goes through initial planning and preparation for SAP project.

    • Define project goals and objectives

    • Clarify the scope of implementation

    • Define project schedule, budget plan, and implementation sequence

    • Establish the project organization and relevant committees and assign resources

    Phase 2: Business Blueprint

    The purpose of this phase is to achieve a common understanding of how the company intends to run SAP to support their business. Also, to refine the original project goals and objectives and revise the overall project schedule in this phase. The result is the Business Blueprint, a detailed documentation of the results gathered during requirements workshops.

    Phase 3: Realization:

    The purpose of this phase is to implement all the business process requirements based on the Business Blueprint. The system configuration methodology is provided in two work packages: Baseline (major scope); and Final configuration (remaining scope). Other key focal areas of this phase are conducting integration tests and drawing up end user documentation.

    Phase 4: Final Preparation:

    The purpose of this phase is to complete the final preparation (including testing, end user training, system management and cutover activities) to finalize your readiness to go live. The Final Preparation phase also serves to resolve all critical open issues. On successful completion of this phase, you are ready to run your business in your live SAP System.

    Phase 5: Go Live & Support:

    The purpose of this phase is to move from a project-oriented, pre-production environment to live production operation. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.

    REGARDS

    MEENAKSHI

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 03, 2007 at 04:46 AM

    forward you a document

    please check

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 26, 2009 at 05:15 AM

    thanku

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.