Hi,

I need some advice for the above title.

This is how the scenario goes.

With the auto fax system, PO to vendors could be sent more than once for various reasons. Currently where there is a changed in the SO, it will trigger a fax output immediately to regenerated to vendor as a result of changes on the item happen after the PO release (in this case changes in SO cause a change in subsequent PO).

SO --> PR --> PO --> auto fax to vendor

The user would like to block from auto fax to vendor when there's a change in SO.

They want the change in SO not to reflect to PR (so that the auto fax will not occur). In case a change of PR or PO which needed to be faxed to vendor, they will have to manually do it in PR.

My concern is:

What can i do so that the change in SO will not reflect to PR? Any userexit, or any other ways in term of abap/ coding? And what are the changes need to be done in technical side. I'm not sure where to begin with.

please advice.

thanks.

Message was edited by:

yue ling

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Mar 30, 2007 at 12:54 PM

    Hi,

    It may not help but have you tried removing the "Create PO automatic" flag from the relevant item category, or does this remove processing that you want to retain?

    Steve B

    Message was edited by:

    Stephen Birchall

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Dipak Kumar

      Hi,

      Thanks for the feedback.

      Our functional has propose this solution to the user earlier on which control via identification of output from routine and enabling authorized person to review the PO before release the second PO output using ME9F:

      However, the user rejected the solution because it is not feasible concerning of large message queue and most users hardly run ME9F.

      They would prefer blocking the change from SO change to PR. If this method is to apply, any userexit, BADI etc which can be used?

      please advice.

      Thanks.

  • author's profile photo Former Member
    Former Member
    Posted on Apr 21, 2007 at 03:15 AM

    Dear all,

    my issue is almost solved. Since user's concerns on large message queue and most users hardly run ME9F, they decided to create a custom program to run ME9F background mode. So the propose solution which to stop the change of SO to PR no longer been used.

    Thanks for all the advice given.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.