ABC indicator for project stock

Former Member
0 Kudos

Is there a way to run MIBC and assign abc indicator to project stock that is not valuated or even for the part numbers to show up on this list? What needs to be done in order for this to show up on the report? IS there a way to make it valuated and but not company own stock valuation?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thank you so much!

Former Member
0 Kudos

Hello Kimberly,

MIBC report will show the list of material based on the Consumption or Requirement and it will suggest ABC indicator considering the both factor.

The Project stock can be managed as valuated project stock or nonvaluated project stock.

For more details, please have a look on the following link

<a href="http://help.sap.com/saphelp_46c/helpdata/en/4d/2b92c943ad11d189410000e829fbbd/frameset.htm">Project Stock</a>

Hope this helps.

Regards

Arif Mansuri