Hi there,
As per my knowledge in the material cost estimate with qty structure we calculate the std cost of material based on the BOM & master recipe for a lot size.........
Now if the process/production order is of greater qty & uses a diffrent master recipe/routing then how the std costing is done.......
Secondly at the same time can we maintain the masterial cost estimate with qty structure for diffrent lot size for the same material simultaneously as with the size of the lot the BOM & routing/master recipe to be used changes........
Please enlighten me .........
Thanks
Kaushik