Dear All,
When i do backflushing sytem throws an "error determining cost estimate".
I am doing backflushing for posting period 10.03.2007. the premilinary cost estimate for the product cost collector was run on 19.03.2007. Is it because of the date, the sytem is throwing the error. If so can anyone suggest how to resolve it.
regards
ranga
I