Skip to Content
0

Delivery Split based out on Material type

Jun 05, 2017 at 08:31 PM

124

avatar image

HI,

How to find the issue in sales order split process.... Say as if a sales order has 2-3 materials assigned in it of different material types(hazardous & non-Hazardous). During delivery of that sales order we need to split separate deliveries based on Material types .

Material AAAAAA has a DG Profile of GPO (relevant for DG Check) and material BBBBB has a DG Profile of G00 (not-relevant for DG Check). Since BBBBBB is not a Hazardous item, these materials should split in to their own delivery.

how to achieve that through Dangerous goods master .

Regards,

Ranjith

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Jayakumar Indracanti Jun 06, 2017 at 04:38 AM
1

Hi Ranjith

In DG separate DG master record. is will be created based on combination of Material and Regulation. So in your current scenario for Non Hazardous Material no DG Master will be created since it is not required for DG Check. You can go ahead and create a DG master for Hazardous Material either by filling or by manual creation of DG master and for non DG do not create any Master record.

System while checking the DG checks it will check based on the assignment at the material master DG indicator profile and it will not block the non DG from delivery.

DG and Non DG based delivery split on Material type is not recommended as a material type can not segregate DG material, however if you use DG indicator profile it gives you flexibility to manage such requirement. As far as configuring the split is concerned you need to use the Transaction VOFM and set up a profile and populate the LIKP-ZUKRL (delivery split) with DG Indicator profile.

Thanks and Regards

Jayakumar

Share
10 |10000 characters needed characters left characters exceeded
Christoph Bergemann Jun 06, 2017 at 07:25 PM
1

Hello Ranjith

SAP EHS DG is not designed to support the "Split" coming form Sales order to delivery. SAP SD does have many "Exits" here you can use. Whatever you do here. this is own coding. So yes: you can generate code which would analyse Data in sales order and yes you can consider DG data. But whatever you do: this is custom code only.

The same is true for "During delivery of that sales order we need to split separate deliveries based on Material types ." (this is not linked to SAP EHS)

The "issue" in the split is: transport mode !! in most cases on sales order level yo have an "idea" to split. But in some cases the split might not be "clever". The "real" DG part comes up in mst caes in "delivery" or in "transport" part of the overall process. Here you might know all the "transport modes" to consider. And only than you have the full picture to split. BUt yes you can split on sales order level. But this is a SAP SD process (with support of DG data)

Conclusion: EHS DG is not designed to support this demand in "one run". But you can use SAP SD options to get it work

C.B.

Show 2 Share
10 |10000 characters needed characters left characters exceeded

...and in SD it's an FAQ that has been answered on SCN gazillion times.

1

Hello Jelena

quite intersting new term: "gazillion times". I really love this new term. Yes it is "FAQ" (still i am on may be intermediate level for SAP SD). But this part I must know (becaus of DG interaction here)

C.B:

0