cancel
Showing results for 
Search instead for 
Did you mean: 

Need support to understand current steps for Engineering Record (Using S/4 H 1610 Fiori App ER, EI)

Former Member
0 Kudos

Hello Team,

During simulate Engineering Record for change BOM object, using Fiori App ER, I'm able to create Engineering Record and do the necessary status change and assigned object like BOM, however I have some struck off points like:

  • Unable to push ER to EI(Engineering Inbox) for check with workflow.
  • Unable to find out the link or steps from where we can edit/change BOM (or assigned objects) directly from the approved ER or Change number.


I have followed the steps as per the course "SAP S/4 HANA R&D ENGINEERING" available with SAP Learning Hub. Please help me out by update me with the steps that I missed.

Accepted Solutions (0)

Answers (0)