Skip to Content
0

Reassign ChaRM Document after TR is released using Release Management in SolMan 7.2

Jun 05, 2017 at 02:07 AM

175

avatar image

Hello Experts,

Is there any option by using which we can reassign ChaRM Documents(where original TRs are released/imported in QA) to other release cycle/phase cycle.

As once we try to perform reassignment of CD from one project to another project, getting below error "You cannot reassign change 8000000315; transport requests cannot be changed"

Release Management looks more promising around flexibility but no luck around this reassignment. Seems its same as it was in SolMan 7.1

Please suggest if there is any way to achieve this.

Regards,

Piyush Jain

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

3 Answers

Prakhar Saxena
Jun 05, 2017 at 06:57 AM
0

Hi Piyush,

This is part of Central CTS feature to reassign releated TRs from one project to another in solman 7.1 or 7.2(as of branches cycles etc)

It is possible to achieve this using Central CTS in 7.1 or 7.2 both using the same. Kindly refer Central CTS documentation.

Below is the extract from the standard(SAP) pdf as shared below.

capture.jpg

Source - (SAP how to guide below link)

https://assets.cdn.sap.com/sapcom/docs/2015/07/8087efc1-5b7c-0010-82c7-eda71af511fa.pdf

https://wiki.scn.sap.com/wiki/display/SM/How+to+work+with+ChaRM+projects+with+cCTS+functionality+activated

thus, You need to configure central CTS based ChaRM for your branches in 7.2 to achieve the same.

Hope this resolves

Thanks

Prakhar


capture.jpg (45.7 kB)
Share
10 |10000 characters needed characters left characters exceeded
Basis Team Jun 06, 2017 at 05:09 AM
0

Thanks Prakhar.

Could you please suggest if this can be achieved from any other way like SolMan have new feature called "Release Management".

Regards,

Piyush

Show 1 Share
10 |10000 characters needed characters left characters exceeded

not possible with simple release management

0
Seshan Prasath Jun 06, 2017 at 09:10 PM
0

Hi Piyush

If CCTS is not configured in 7.1/7.2 (at branch level as Prakhar mentioned ) then Change Project Assignment option will not work if the associated TRs in a Change Documentis/are released. Release Management in 7.2 helps running Major/minor Software Releases in a streamlined fashion.

Share
10 |10000 characters needed characters left characters exceeded