CJ44 book overhead costs in the following period

Jun 02, 2017 at 03:02 PM

173

avatar image
Former Member

Dear PS & CO Experts,

we have the requirement to book overhead costs from the remaining period e.g. 5 in the following period e.g. 6.

We want to run CJ44 for period 5, but the budat should be in period 6 e.g. 02.06.2017

Is that possible?

(At the moment the field budat in Cj44 allows only to fill in a budat from the selected period. E.g. period is 5, budat have to be in 5 -> only 31.05.2017 is allowed)

Every answer is welcome!

Thanks