cancel
Showing results for 
Search instead for 
Did you mean: 

background processing

Former Member
0 Kudos

Hi guys,

What is the background processing in product costing

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

In product costing you specify CK40N or CK11N or CKUC, but I think you mean CK40N.

If you select background processing, you cost material not in dialog in background. So costing of material / materials does not depend your connection to the server, so bacground processing is preferren generally because of the reason specified above and because of performance.