planning area realignment

Hi Expert,

when I make a realignment in the planning area and I use the logic delete the source and overwrite the taget value, I found some CVC forecast are lost only the demand history is copied to the destination CVC.

does anyone encounter this kind of problem?

thanks!

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Mar 17, 2007 at 12:18 PM

    Hi,

    Can you tell us, which version of the system you use?

    It would be better if you describe what you have done, step by step.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 18, 2007 at 09:30 AM

    Hi,

    our current APO version is SCM4.1

    I use the standard realignment transcation code:

    1. I create realignment table according to the current requirement. like some material related sales orgnization has been changed.

    2. I import these CVC into the realignment table. like mateiral nubmer, plant and sales orgnization etc.

    3. I run this realignment as a backgroud job.

    by the way, I found during this realignment, the system alway termintes without live anocher, and I check this material with termination, the system has delete the old CVC and create a new one but all key figure value are lost. but I use the time series function to chech the CVC time series, they are all ok.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 21, 2007 at 05:38 AM

    Hi All,

    the problem has been solved via running synchronize time series program.

    thank you very much

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Mukesh,

      The consistency program checks if for all the planning cominations there exists a valid time stream for the period the planning area is initialized. This problem usually occurs if we have created the charateristics combinations but " Not adjusted the time series immediately".

      The programs removes these inconsistencies.

      Regards,

      Kedar

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.