on 03-15-2007 12:58 PM
Hi,
I want to schedual a job with the following condition.
The job must be execute only at the last 3 days of the current month & at the first 3 days of the next comming month....
i.e: 28/03/07 to 03/04/07
Need your help....
Regards,
Neehir Bhatt
there are following options to schedule a job,
hourly, daily, weekly, monthly and other period. in other period you can specify month, week, days etc..
alternative for you is schedule the required jobs for monthly basis.
cheers,
-Sunil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As Ed indicated, you can do this in SAP CPS Calendars.
You need to create a time window with two elements, using the "Advanced" option in the element:
- one for the last three days in the month (using the "last day in month" function)
- one for the first three days in the month (using the "day in month" function)
In both cases you can specify a range of days to be included.
Regards,
Anton.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Neehir,
Your requirement is partially possible in standard SAP but you need to to this activity everymonth.
What you can do is say on 28th of a month you create a job with periodicity daily. Then in scheduled start you can give 28th of the current month with the time. Then in No start after you can give 3rd of next month with the time of the run.
But then this activity will have to be done on monthly basis.
May be it is possible through third party SAP job scheduling tools like Redwood,UC4 etc.
Please award points accordingly.
Regards.
Ruchit.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you can do this thing with the factory calander.
SAP Factory Calendar -
Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
you can get more help in:
[https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/97d2e8b3-0b01-0010-b787-b8ce558a51c2|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/97d2e8b3-0b01-0010-b787-b8ce558a51c2]
in transaction RSPC you can schedualing job and use the calendar in the start process chain.
I doubt this could be done with standard features, you really might want to check the third party tools available for this. Naturally, I'd recommend you'd try [BatchMan|http://honico.com/content/EN/batchman.html] in which this could be done very easily, but I can't speak for the other tools.
User | Count |
---|---|
95 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.