Hi all,
Im working with ECM main screen (CC01, CC02 ) and the names assigned in the Standard process are not meeting tour needs and some steps are missing in order to cover all the specifications.
If in a easy way I could change the name of the system status steps ( for instance change Convert ECR into Start modifications) will be great and, if this change could be link to a type of ECR would be like a dream because this will meet all the client requirement.
Any comment or suggestion in how to do that? User status are not valid :S
Many thanks in advance
Alberto