on 03-13-2007 5:14 PM
Hello,
When trying to replenish the fixed bin locations for batched items the system will propose multiple batches if the first location does not contain enough material to fill the requirement. (System then goes to another location) This results in a failure to create the TO due to 'mixed storage not allowed'. The fixed bins do not allow mixed storage.
Does anyone know how to restrict the replenishment process to select only a single batch during replenishment?
Thank you,
Eric
Hello Eric,
Logically if material is with fix bin then it should allow mixe storage. The reason is in the same storage type one material can not have more than one fixed bin so you need to change the settings to allow mixed storage.
Hope this helps.
Regards
Arif Mansuri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.