Hi experts,

I've a problem that i think that it's possible resolve with SAP standard. I want plan transfers between SL to SL MRP Area.

For that: I've a centre with two storage locations(A & B), one of them is a MRP area (B).

For one material, I've stock in both storage locations, but A is my production storage location and its where I show all my consumptions/PIR.

I want that, when A storage location needs material for this consumptions. When I will run the MPS/MRP for that centre, SAP

  • In A storage location, MRP should be create a stock transfer requirements/purchase requirement to B.
  • In B storage location I need to show than I have a requirement from A storage location and evaluate now if i need to purchase material from external source of supply.

I tried to use this solutions but i can not resolve with it.

https://help.sap.com/erp2005_ehp_04/helpdata/EN/2e/98b6535fe6b74ce10000000a174cb4/frameset.htm

  • Using 45 special procurement type.

All help is welcome.

Thanks in advance.