Hi Bpc Friends

We have BPC 10 cpm 801 sp11 and we want to upgrade to have the compatibility with Office 2016.

The possible scenarios are:

1) upgrade BPC 10 to cpm 801 sp 17

2) upgrade to BPC 10.1

What do you recommend?

Has anyone upgraded from 10 to 10.1?

Which activities are involved to upgrade to BPC 10.1?

Thanks

Michele

Accepted Solutions (1)

Accepted Solutions (1)

former_member186338
Active Contributor
0 Kudos

"We have BPC 10 cpm 801 sp11 and we want to upgrade to have the compatibility with Office 2016." - strange reason for upgrade...

What issues do you have with EPM on Office 2016????

In general first I will prefer to upgrade BPC 10 to cpm 801 sp 17

And then to 10.1 including BW upgrade to 7.50 were BPC 10.1 is already included.

Former Member
0 Kudos

thanks Vadim.

The basis team leader is planning the upgrade, we don't have Office 2016 yet.

He will proposes the BPC 10 SP 17 and the BPC 10.1

For BPC 10.1 is BW 7.5 mandatory? we will use the classic model not the embedded

If we upgrade to BPC 10.1 we need to create from scratch all the BPFs?

Thanks

Michele

former_member186338
Active Contributor

"The basis team leader is planning the upgrade, we don't have Office 2016 yet." - I am using Office 2016 with old versions of BPC without issues. It's not a real reason for upgrade.

I do not recommend to upgrade to the latest SP of 10.1 in a single step. A lot of changes...

May be it's better to upgrade to the latest SP of BPC 10 and then - to BPC 10.1.

BW7.50 is not mandatory but to my mind now it's better to use it.

Former Member
0 Kudos

thanks Vadim

I will let him know that we don't need to upgrade so we can keep this version of bpc for the moment.

Because they are also thinking to migrate from bw 7.3 to bw 7.5 could be good at that point to migrate to bpc 10.1?

Let me know your thoughts, they will be very helpful for me

Thanks

Michele

former_member186338
Active Contributor

EPM version used?

Former Member
0 Kudos

EPM 25 for the new installation, EPM 23 for the others

former_member186338
Active Contributor

At least EPM 25 is working fine on Office 2016, I have used it myself.

Former Member
0 Kudos

yes I have been testing on some test laptop with Windows 10 and Office 2016

Former Member
0 Kudos

Vadim what do you mean saying that BPC 10.1 is already included in BW 7.5?

if the company migrate to BW 7.5 (without Hana) could be good in the same moment to migrate from bpc 10 to bpc 10.1?

Thanks

Michele