on 03-08-2007 8:34 AM
in TCODE BS02
10 CRTD PRO CRE 10 70
20 PROG IN PROGRESS 20 70
30 KOFF KICKOFF DONE 30 70
40 SSTD SYSTEM STUDY 40 70
50 DSGN DESIGN PHASE 50 70
60 ALPH ALPHA PHASE 60 70
70 HOLD ON HOLD 10 70
this is user status of the project.
from status 10-60 I can move forward to any status directly. but I cant reverse the same.
But If I select status 70 once.
then I can move to any status even backwards also
like from 40 to 30 to 20 like this. this happens only when I make status 70 as active once.
Pls suggest.
Points will be rewarded.
Thanks
Vinayak
Thanks