Skip to Content
0

HDB installation fails with SPS 12 on SLES 12 with bad memory blocks error

Jun 01, 2017 at 11:49 AM

45

avatar image
Former Member

Key error messages from the console output and log files are as below.Sufficient memory of 144GB is present in the server.What could be the possible reasons?

ERR : Installation of SAP HANA system failed.

INFO: Summary of critical errors<br>ERR : Installation of SAP HANA system failed.<br>ERR : Installation of SAP HANA Database failed<br>INFO: Installation failed<br>INFO: error installing<br>INFO: Cannot create Instance<br>INFO: Cannot create instance<br>INFO: Cannot create SecureStore<br>INFO: Switching to user id 1000 and group id 200.<br>INFO: Starting external program /usr/sap/<SID>/HDB00/exe/hdbnsutil<br>INFO: Command line is: /usr/sap/<SID>/HDB00/exe/hdbnsutil -createSecureStore<br>INFO: Program /usr/sap/<SID>/HDB00/exe/hdbnsutil terminated with error: signal 6<br>INFO: Switching back to root user.<br>INFO: /usr/sap/<SID>/HDB00/exe/hdbnsutil call failed<br>INFO: Program /usr/sap/<SID>/HDB00/exe/hdbnsutil terminated with error: signal 6
10 |10000 characters needed characters left characters exceeded

Can you provide the full installation log?

Best regards

Bartosz

0
* Please Login or Register to Answer, Follow or Comment.

0 Answers