Remove GR Processing Time for STR created in MRP Area Level

May 26, 2017 at 02:32 PM

28

avatar image
Former Member

Dear Expert,

When we run MRP, the STR created for MRP Area level contains the GR Processing Time from Material Master Plant Data. This is not suitable for our requirement since GR Processing Time in plant level is used for Inspection time, while for STR there is no inspection needed.

Any idea how to solve this?

Thanks,

Hengky