Requirement :

We have to create a new output message type and link it to a specific Purchase Order type. This Purchase Order type already has a defined output message type, so this new one will be an additional type, which needs to be called on creation fo the PO.

Questions :

  1. Can a PO have multiple message output called simultaneously, on creation ?
  2. In our case, the PO is not pulling the newly defined output message type automatically, on PO create

Configuration done so far :

***SPRO > MM-Purchasing > Messages > Output control > Message types > Define message type for PO - new one defined, based on standard 'NEU' (copying all entries)

  • Processing routine : transmission medium = EDI, Program =

RSNASTED and Form routine = EDI_PROCESSING

  • Partner Roles : Medium = EDI, Function = LS

***SPRO > MM-Purchasing > Messages > Output control > Message types > Fine-Tuned Control: Purchase Order

  • New entry added for new output type (copying from 'NEU')

***SPRO > Materials management > Purchasing > Messages > Output control > Message determination schema > Maintain Message Determination Schema: Purchase Order

  • Procedure : RMBEF1 (Purchase Order)
  • Control data : new entry added for new output type (copying from 'NEU')

***SPRO > Materials management > Purchasing > Messages > Output control > Message determination schema > Assign Schema to Purchase Order

  • PO procedure RMBEF1 defined

***SPRO > Materials management > Purchasing > Messages > Output control > Partner roles per message types

  • new message output type already appears here with transmission medium 6 (EDI)

NACE settings done for new output types using KEY COMBINATION 'Purchasing Output Determination : Document type' > Purchase order type (which should pull through this new output message type on create) defined

Please can you suggest how to go about fixing this problem. Is there any configuration step missing ?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Best Answer
    May 29, 2017 at 10:56 AM

    You probably have a an indicator for exclusive in your access sequence, which means when the first message is found then system stops looking for other messages.

    Kindly go through existing documentation like this wiki which explains the message determination in quite a big detail: https://wiki.scn.sap.com/wiki/display/ERPSCM/Message+determination+in+Purchasing

    Add comment
    10|10000 characters needed characters exceeded

    • Read the F1 field help for the Exclusive indicator

      Remove the indicator and test your scenario. if it works then accept answer to the discussion otherwise elaborate by showing what the result of the test was.

  • May 26, 2017 at 12:13 PM

    Hi,

    DId you create a condition record? MN04?

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

  • May 26, 2017 at 12:13 PM

    Hi,

    DId you create a condition record? T-code MN04?

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

  • May 29, 2017 at 08:06 AM

    Hi Kavita,

    Yes, I did create a condition record in MN04.

    thanks,

    Maria

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 29, 2017 at 10:24 AM

    Hi

    Have you maintained fine tune control IMG-Material Management- purchasing - messages