CO11N Order operation sequence to be followed in confirmation

May 25, 2017 at 08:18 AM

331

avatar image

Dear All,

I have a requirement in which users should not be able to confirm the next operation (0020) production order without confirming previous operation (0010). In my case only one routing operation per order,so in every PRODUCTION order only 0010 routing operation will be there.I made settings in OPK4,"E Error when operation sequence is not adhered to"and in OPJ8 routing control key,"2 Confirmation required". Is there any other way to restrict?

Thanks in advance.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

4 Answers

swapnil rajane May 30, 2017 at 12:46 PM
1
Show 2 Share
10 |10000 characters needed characters left characters exceeded

Hello Swapnil,

Thanks for your reply. I checked out the links posted by you. Its good for restriction. But how to prevent the confirmation of next production order if previous production order is not confirmed?? How does system know it? Am quite doubtful about the logic here. Correct me if am wrong.

Regards,

Jeffrey.

0

Hello Jeffrey,

I don't think that this requirement can be achieved through standard configuration.Second thought for Z development,then it will going to be a huge development with lots of logic and validation which I think little bit tricky because of so many entries of production order created.

Anyways you can derived the below logic if you want to go for Z developement.

1.Find Co11n or Cor6n tcode user exit for confirmation.

2.Take reference of AFRU table and select the number of productions order based on date.I think here you need to finalise the logic for past number of days which order needs to be select with a status rel and not confirmed.

3.Take a reference of JEST table for production order and operation status details.

Regards.

Swapnil Rajane

0
Caetano Almeida
Jun 01, 2017 at 05:00 PM
1

Instead of releasing the order at header level, you can go to the operations screen, select the desired operation and then press the green flag. That way you will only release one specific operation and you will not be able to post confirmations for the subsequent operations.

Share
10 |10000 characters needed characters left characters exceeded
Solomon Macwan May 25, 2017 at 09:07 AM
0

Hi Jeffrey,

This is the setting which need to be done. Have you tested the setting which you made?

regards,

Solomon

Show 3 Share
10 |10000 characters needed characters left characters exceeded

Hello Solomon,

Yes i tested it,it's allowing for confirmation. Actually case is like this say,

Order no: 210000094 Routing: 0010 mixing Material B

Order no: 210000095 Routing: 0010 grinding Material A

Without confirming 210000094 users shouldn't confirm 210000095..

0

The setting is relevant for one order, if there are multiple operation in one production order, it has nothing to do with multiple order.

If you need to do this kind of setting in different order than it shoud me MTO process than only you can achive this by customization.

regards,

Solomon

0

Hello Solomon,

Thanks for your reply. Here we follow both MTS and MTO, i.e strategy 40..so now what settings should i maintain for this case? Or is it possible through user exits or enhancements?

Thanks..

0
Caetano Almeida
May 25, 2017 at 02:03 PM
0

Hello

Another option is to release the first operation instead of the whole order. Then you can use trigger points to release the subsequent operations upon the confirmation.

Best regards,
Caetano Almeida

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hello Caetano,

Thanks for your reply. For your info, actually here we consider all operations as individual SFG materials. So if 3 operations,then 3 SFGs and 3 Production orders for those 3 SFG materials. And with one operation in routing for each SFG. So when coming to your point you said release operations,i didnt get what you meant. Can you elaborate a little or post link?

Regards,

0