RFC Adaptor - Pull & Schedule

Hi,

I want to send the data from R/3 to File.

1. Can xi will take (pull) from R/3 every 4 hours. if it is how to configure

2. If XI Can't pull from R/3. How to Schedule from R/3 Side.

Thanks & Regadrs

Ravichandran K

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Posted on Mar 02, 2007 at 01:17 PM

    Ravi,

    Using the same thread for the related question at times can help as everyone can then understand the context of your question.

    Sender RFC Adaptor doubt

    Like mentioned in your ealrier thread, XI cannot pull the data and so, you have multiple options to handle this scenario,

    1. Schedule a report ( maybe a dummy report ) in your SAP system that will trigger the call to XI. XI will receive the call from the report ( maybe dummy call) inside a BPM and then make the synchronous call to your SAP system by filling the request and then passing the final response to the target file. Refer to the blog

    /people/arpit.seth/blog/2005/06/27/rfc-scenario-using-bpm--starter-kit

    This shows a File RFC File. Just make the change to use a Sender RFC instead of the Sender File.

    2. If you can fill the RFC request in the R3 system itself, then either write the reprt that will directly trigger the RFC response to XI using the Sender RFC adapter and map this to your file. This report can also be scheduled in the SAP system to run every four horurs

    3. Use ABAP proxies as shown in this blog,

    Weblog to send Response from RFC to File in Asyn Mode Using Proxy [original link is broken]

    Regards

    Bhavesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 02, 2007 at 01:35 PM

    Hi Ravi,

    <i>Can xi will take (pull) from R/3 every 4 hours. if it is how to configure</i> - No from XI it is not possible.

    <i>If XI Can't pull from R/3. How to Schedule from R/3 Side</i> - For this in R/3 create an ABAP executatble report in SE38, in that report create your IDOC ....and then create a job in R/3 to trigger that report with default parameters...then schedule this job for every 4 hours.........so this job will run every 4 hours, so your report will run, so your IDOC will be created and then your IDOC will be sent to XI.

    Thanks,

    Rajeev Gupta

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 02, 2007 at 02:00 PM

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.