Hi !!!

I have two plants with 2 storage location..and I want that evry material reservation created in a Storage A is copied in Storage B automatically.

Evry Plants have a MRP Area, how i can do it ?

by

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Mar 02, 2007 at 12:54 PM

    Hi

    If both storage loc A and B are in the same plant, I do not suggest the above as your MRP is at plant level. This will be doubling the requirement. If you still want to do it:

    You need to write z-program for this.

    Write a custom program to check the reservations created during a particular time period and create another reservations using BAPI .

    If Storage loc A & B belong to different plants, and you want to take the demand of storage loc A plant A to be produced in Storage loc B and Plant B, then you can use special procurement type (stock transfer in another plant) in MRP parameters of material master.

    1) Run MRP in plant A. This creates a stock transfer requirement from B.

    2)Run MRP in Plant B. For the requirements created by MRP run in A, MRP will give you production/procurement proposal.

    Best regards

    Ramki

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.