cancel
Showing results for 
Search instead for 
Did you mean: 

BPC NW 10.1 Transport with remodeling long processing time

0 Kudos

Hi all,

we added a dimension in our model in the development system and then we transported this change to the quality system but the CR took almost 30 hours to end. The model in the quality system had nearly 25 million of records.

The transport went fine but I think it took too much to complete the transport and the post-transport activities. We are worried that the transport in the production system (where there are nearly 100 million of records) could take a lot more.

Is this standard?

System specs:

SAP_BW 740 0014

CPMBPC 810 0009

HANABPC 810 0009

DB HANA


Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member186338
Active Contributor
0 Kudos

It depends on many factors. You can make tests on the copy of environment - try to add dimension and check time.